Prefer a chat interface with context about you and your work?
Average run length to false alarm for surveillance schemes designed with partially specified pre-change distribution
Observations are taken independently and sequentially. Detection of a change in distribution is studied when the problem has an invariance structure. The prechange distribution is assumed to be a member of a specified family and is assumed known up to a nuisance parameter. We provide a general method of constructing …